Re: [6tsch] work item 2: centralized route and track computation with PCE
Qin Wang <qinwang@berkeley.edu> Tue, 23 July 2013 12:34 UTC
Return-Path: <qinwang@berkeley.edu>
X-Original-To: 6tsch@ietfa.amsl.com
Delivered-To: 6tsch@ietfa.amsl.com
Received: from localhost (localhost [127.0.0.1]) by ietfa.amsl.com (Postfix)
with ESMTP id A109511E811F for <6tsch@ietfa.amsl.com>;
Tue, 23 Jul 2013 05:34:04 -0700 (PDT)
X-Virus-Scanned: amavisd-new at amsl.com
X-Spam-Flag: NO
X-Spam-Score: -2.326
X-Spam-Level:
X-Spam-Status: No, score=-2.326 tagged_above=-999 required=5 tests=[AWL=0.650,
BAYES_00=-2.599, FM_FORGED_GMAIL=0.622, HTML_MESSAGE=0.001,
RCVD_IN_DNSWL_LOW=-1]
Received: from mail.ietf.org ([12.22.58.30]) by localhost (ietfa.amsl.com
[127.0.0.1]) (amavisd-new, port 10024) with ESMTP id m4HhIC82Fcbu for
<6tsch@ietfa.amsl.com>; Tue, 23 Jul 2013 05:34:00 -0700 (PDT)
Received: from mail-ob0-f179.google.com (mail-ob0-f179.google.com
[209.85.214.179]) by ietfa.amsl.com (Postfix) with ESMTP id 4DBAF11E8104 for
<6tsch@ietf.org>; Tue, 23 Jul 2013 05:34:00 -0700 (PDT)
Received: by mail-ob0-f179.google.com with SMTP id xk17so9816896obc.38 for
<6tsch@ietf.org>; Tue, 23 Jul 2013 05:33:58 -0700 (PDT)
X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=google.com;
s=20120113;
h=mime-version:in-reply-to:references:date:message-id:subject:from:to
:cc:content-type:x-gm-message-state;
bh=BEHZXCbM1MHkkimTwrM9xKYjTaKU+Xe7OgjWfcRc9aQ=;
b=Kz3R/6JtiURY8qHTreBiLwEvnxIwWO4SRgWEDO0KcqyQZUAE16NAT5ac7KUYI2ik1F
83s8tk+hk/BYuvmwSn8UaxBCfUw1FMSqcKq4Ihz9kUTVKJsnfbsr23dxGORJFLO1fOLC
YzNH9h8Q3FAn4ya8vi9rAkrhq04ZAOY4eusKVugN1L36nk+zDtPGAUoi96D0QesFTul0
++fabyRvPMAWkEdO5JTqYZbAl6uLwu0Zv6wubt4qT9eRIa6f1hk+A5x3pzj39D5KS56/
D8imeEeKUzQdrZPOJgVt0olwAG583HnWFO4ahDJBljcBrVCjx+FdbaKLSDmWPp6UOfg/ nd2A==
MIME-Version: 1.0
X-Received: by 10.42.11.211 with SMTP id v19mr18269903icv.29.1374582838570;
Tue, 23 Jul 2013 05:33:58 -0700 (PDT)
Received: by 10.64.171.82 with HTTP; Tue, 23 Jul 2013 05:33:58 -0700 (PDT)
In-Reply-To: <E045AECD98228444A58C61C200AE1BD841391C8B@xmb-rcd-x01.cisco.com>
References: <E045AECD98228444A58C61C200AE1BD841391C8B@xmb-rcd-x01.cisco.com>
Date: Tue, 23 Jul 2013 20:33:58 +0800
Message-ID: <CAAzoce68oQdOD0bVboZquReuHJjCqggTsvNxOodpxtY7gc9N6Q@mail.gmail.com>
From: Qin Wang <qinwang@berkeley.edu>
To: "Pascal Thubert (pthubert)" <pthubert@cisco.com>
Content-Type: multipart/alternative; boundary=20cf301d3e60ced7ff04e22d0135
X-Gm-Message-State: ALoCoQlCGHy1REFdMsVMvcBdF8FAteX+zqvYY6YuTwoWZ+4XXS0+EOojaG7SQ8FGpkiBnKq9qngz
Cc: "maria-rita.palattella@uni.lu" <maria-rita.palattella@uni.lu>,
"Raghuram Sudhaakar \(rsudhaak\)" <rsudhaak@cisco.com>,
"6tsch@ietf.org" <6tsch@ietf.org>,
Thomas Watteyne <watteyne@eecs.berkeley.edu>
Subject: Re: [6tsch] work item 2: centralized route and track computation with
PCE
X-BeenThere: 6tsch@ietf.org
X-Mailman-Version: 2.1.12
Precedence: list
List-Id: "Discuss link layer model for Deterministic IPv6 over the TSCH mode
of IEEE 802.15.4e,
and impacts on RPL and 6LoWPAN such as resource allocation" <6tsch.ietf.org>
List-Unsubscribe: <https://www.ietf.org/mailman/options/6tsch>,
<mailto:6tsch-request@ietf.org?subject=unsubscribe>
List-Archive: <http://www.ietf.org/mail-archive/web/6tsch>
List-Post: <mailto:6tsch@ietf.org>
List-Help: <mailto:6tsch-request@ietf.org?subject=help>
List-Subscribe: <https://www.ietf.org/mailman/listinfo/6tsch>,
<mailto:6tsch-request@ietf.org?subject=subscribe>
X-List-Received-Date: Tue, 23 Jul 2013 12:34:04 -0000
Hi Pascal, What I read from the new paragraph is that the task will result in two sets of operations, i.e. (1) and (2) in the paragraph, one should be implemented in routing layer, and another should be implemented in 6top sublayer. I think the operations needed are almost there. But, the problem is 6TSCH only focus on 6top sublayer, and can not require specific function in routing layer, correct? So, can we just describe what operations will be investigated, and don't specify which layer will be responsible for the operations. In fact, I think , at end of result, 6top has to take care the operations needed, otherwise, I'm afraid we will leave another gap in the protocol stack. How do you think? Qin On Tue, Jul 23, 2013 at 6:34 PM, Pascal Thubert (pthubert) < pthubert@cisco.com> wrote: > Hello Raghu and all:**** > > ** ** > > About item 2 6TSCH Centralized Management:**** > > ** ** > > Since we wrote the charter a few months ago we have been digging and it > appears that we are probably not ready for going standard track right away > with a 6TSCH document.**** > > - In one hand, we understand better that the PCE is the component we need > for both centralized route AND track computation.**** > > - OTOH, we realized that PCEP only covers a limited portion of the > required standard work and we realize that we need to dig deeper in what > needs to be done, in particular to locate the PCE(s), export topology and > metrics to the PCE, and then install routes and tracks from the PCE. We > also understand that some of that work belongs to the PCE working group > though it is unclear exactly how much that is.**** > > ** ** > > Right now the charter has this:**** > > ** ** > > 2. Produce "6TSCH centralized management" to define the mechanism by which > an**** > > external Path Computation Element can communicate with the 6top protocol > layer**** > > of the different nodes in the network (1) to modify their TSCH schedule and > **** > > (2) to gather link quality statistics and data flow requirements. The WG > will**** > > initially look at PCEP and CoAP.**** > > Depending on the applicability of PCEP, this document will be targeted to* > *** > > proposed standard.**** > > ** ** > > In the light of our studies, I’d suggest this:**** > > 2. Produce requirements and an overall architecture for "6TSCH > centralized routes and tracks management" **** > > describing the mechanism by which an external Path Computation Element > (PCE) can communicate with **** > > devices in a 6TSCH network in order to maintain routing and forwarding > states. In detail, the WG will **** > > consider operations (1) by the device routing layer for (i) sending > topological information and routing **** > > metrics to the PCE, and (ii) getting on-demand routing information; and > (2) by the device 6top sublayer **** > > for exporting neighboring and link quality statistics to the PCE and (2) > requesting to (re)compute and **** > > install a track that meets explicit flow requirements.**** > > ** ** > > What do you guys think?**** > > ** ** > > ** ** > > Pascal**** > > ** ** > > *From:* 6tsch-bounces@ietf.org [mailto:6tsch-bounces@ietf.org] *On Behalf > Of *Raghuram Sudhaakar (rsudhaak) > *Sent:* lundi 22 juillet 2013 07:25 > *To:* 6tsch@ietf.org > *Subject:* [6tsch] slides for work items**** > > ** ** > > All,**** > > Attached are the slides for the work items. Please provide your comments.* > *** > > ** ** > > Specifically, please provide feedback on whether we must have the security > framework as a work item.**** > > ** ** > > -raghuram**** > > _______________________________________________ > 6tsch mailing list > 6tsch@ietf.org > https://www.ietf.org/mailman/listinfo/6tsch > >
- [6tsch] work item 2: centralized route and track … Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Xavier Vilajosana Guillen
- Re: [6tsch] work item 2: centralized route and tr… Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Maria Rita PALATTELLA
- Re: [6tsch] work item 2: centralized route and tr… Qin Wang
- Re: [6tsch] work item 2: centralized route and tr… Pascal Thubert (pthubert)
- [6tsch] work item 2: centralized route and track … Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Maria Rita PALATTELLA
- Re: [6tsch] work item 2: centralized route and tr… Michael Richardson
- Re: [6tsch] work item 2: centralized route and tr… Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Raghuram Sudhaakar (rsudhaak)
- Re: [6tsch] work item 2: centralized route and tr… Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Thomas Watteyne
- Re: [6tsch] work item 2: centralized route and tr… Michael Richardson
- Re: [6tsch] work item 2: centralized route and tr… Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Thomas Watteyne
- Re: [6tsch] work item 2: centralized route and tr… Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Michael Richardson
- Re: [6tsch] work item 2: centralized route and tr… Pascal Thubert (pthubert)
- Re: [6tsch] work item 2: centralized route and tr… Michael Richardson
- Re: [6tsch] work item 2: centralized route and tr… Thomas Watteyne