Re: [PWE3] Updates to goals and milestones
"Bocci, Matthew (Matthew)" <matthew.bocci@alcatel-lucent.com> Tue, 08 May 2012 14:38 UTC
Return-Path: <matthew.bocci@alcatel-lucent.com>
X-Original-To: pwe3@ietfa.amsl.com
Delivered-To: pwe3@ietfa.amsl.com
Received: from localhost (localhost [127.0.0.1]) by ietfa.amsl.com (Postfix) with ESMTP id AA90121F8542 for <pwe3@ietfa.amsl.com>; Tue, 8 May 2012 07:38:33 -0700 (PDT)
X-Virus-Scanned: amavisd-new at amsl.com
X-Spam-Flag: NO
X-Spam-Score: -107.77
X-Spam-Level:
X-Spam-Status: No, score=-107.77 tagged_above=-999 required=5 tests=[AWL=-1.522, BAYES_00=-2.599, HELO_EQ_FR=0.35, HTML_MESSAGE=0.001, RCVD_IN_DNSWL_MED=-4, USER_IN_WHITELIST=-100]
Received: from mail.ietf.org ([12.22.58.30]) by localhost (ietfa.amsl.com [127.0.0.1]) (amavisd-new, port 10024) with ESMTP id AFf+0lrlHLYt for <pwe3@ietfa.amsl.com>; Tue, 8 May 2012 07:38:32 -0700 (PDT)
Received: from smail6.alcatel.fr (smail6.alcatel.fr [62.23.212.42]) by ietfa.amsl.com (Postfix) with ESMTP id F1F2A21F84B5 for <pwe3@ietf.org>; Tue, 8 May 2012 07:38:31 -0700 (PDT)
Received: from FRMRSSXCHHUB01.dc-m.alcatel-lucent.com (FRMRSSXCHHUB01.dc-m.alcatel-lucent.com [135.120.45.61]) by smail6.alcatel.fr (8.14.3/8.14.3/ICT) with ESMTP id q48EcTtp032571 (version=TLSv1/SSLv3 cipher=RC4-MD5 bits=128 verify=NOT); Tue, 8 May 2012 16:38:30 +0200
Received: from FRMRSSXCHMBSA3.dc-m.alcatel-lucent.com ([135.120.45.34]) by FRMRSSXCHHUB01.dc-m.alcatel-lucent.com ([135.120.45.61]) with mapi; Tue, 8 May 2012 16:38:29 +0200
From: "Bocci, Matthew (Matthew)" <matthew.bocci@alcatel-lucent.com>
To: Yaakov Stein <yaakov_s@rad.com>
Date: Tue, 08 May 2012 16:38:26 +0200
Thread-Topic: [PWE3] Updates to goals and milestones
Thread-Index: Ac0tKDxAySVpxwGSTb+yOW64e9OSFg==
Message-ID: <CBCEEDB2.2A764%matthew.bocci@alcatel-lucent.com>
In-Reply-To: <07F7D7DED63154409F13298786A2ADC9043C67CD@EXRAD5.ad.rad.co.il>
Accept-Language: en-US
Content-Language: en-US
X-MS-Has-Attach:
X-MS-TNEF-Correlator:
user-agent: Microsoft-MacOutlook/14.2.0.120402
acceptlanguage: en-US
Content-Type: multipart/alternative; boundary="_000_CBCEEDB22A764matthewboccialcatellucentcom_"
MIME-Version: 1.0
X-Scanned-By: MIMEDefang 2.69 on 155.132.188.84
Cc: "pwe3@ietf.org" <pwe3@ietf.org>
Subject: Re: [PWE3] Updates to goals and milestones
X-BeenThere: pwe3@ietf.org
X-Mailman-Version: 2.1.12
Precedence: list
List-Id: Pseudo Wires Edge to Edge <pwe3.ietf.org>
List-Unsubscribe: <https://www.ietf.org/mailman/options/pwe3>, <mailto:pwe3-request@ietf.org?subject=unsubscribe>
List-Archive: <http://www.ietf.org/mail-archive/web/pwe3>
List-Post: <mailto:pwe3@ietf.org>
List-Help: <mailto:pwe3-request@ietf.org?subject=help>
List-Subscribe: <https://www.ietf.org/mailman/listinfo/pwe3>, <mailto:pwe3-request@ietf.org?subject=subscribe>
X-List-Received-Date: Tue, 08 May 2012 14:38:33 -0000
Yakov,
We currently have two separate drafts covering the first two bullets, but I am not sure that the milestones should be interpreted as a mapping to separate drafts.
I believe the WG has only discussed VCCV 'rationalisation' in terms of reducing the number of channel types. Do you think we should fold RFC5885 into the bis?
Regards
Matthew
On 08/05/2012 15:03, "Yaakov Stein" <yaakov_s@rad.com<mailto:yaakov_s@rad.com>> wrote:
Matthew
What if a single document (5085-bis) solves all these problems ?
Would you still want 3 milestones ?
Does "rationalization of VCCV" include unifying the BFD portion in RFC 5885
with the rest of the modes (thus obsoleting 5085 and 5885) ?
Y(J)S
From: pwe3-bounces@ietf.org<mailto:pwe3-bounces@ietf.org> [mailto:pwe3-bounces@ietf.org] On Behalf Of Bocci, Matthew (Matthew)
Sent: Tuesday, May 08, 2012 13:19
To: Gregory Mirsky; Carlos Pignataro (cpignata)
Cc: pwe3@ietf.org<mailto:pwe3@ietf.org>
Subject: Re: [PWE3] Updates to goals and milestones
Greg, Carlos,
I think this milestone started life as referring to any PW OAM extensions required for MPLS-TP. However, it has become very ambiguous. There are really a number of objectives that we should capture, including at least the following:
* Additional VCCV Channel Type using the GAL
* VCCV capability negotiation for MPLS-TP OAM tools.
* Rationalisation of VCCV (RFC5085bis)
I think we could replace this milestone with milestones for the above.
Regards
Matthew
On 04/05/2012 20:53, "Gregory Mirsky" <gregory.mirsky@ericsson.com<mailto:gregory.mirsky@ericsson.com>> wrote:
Dear Matthew, Carlos, et al.,
I agree with Carlos that updates to VCCV Control Channels resulting from discussion of GAL as Type 4 VCCV CC, perhaps as RFC5085bis, can be captured in Milestones. But I think that this work not necessarily tied with CV capability extension that, I think, referenced as "Enhanced PW OAM".
Regards,
Greg
________________________________
From:pwe3-bounces@ietf.org<mailto:pwe3-bounces@ietf.org> [mailto:pwe3-bounces@ietf.org] On Behalf Of Carlos Pignataro (cpignata)
Sent: Friday, May 04, 2012 4:38 AM
To: Bocci, Matthew (Matthew)
Cc: pwe3@ietf.org<mailto:pwe3@ietf.org>
Subject: Re: [PWE3] Updates to goals and milestones
Matthew,
In Paris there was discussion (and subsequent followup) about a VCCV-bis document. I am not sure if a formal consensus call was issued on that, but I wonder if it needs to be captured as a milestone (or how it relates to "Enhanced PW OAM").
Thumb typed by Carlos Pignataro.
Excuze typofraphicak errows
On May 4, 2012, at 6:39 AM, "Bocci, Matthew (Matthew)" <matthew.bocci@alcatel-lucent.com<mailto:matthew.bocci@alcatel-lucent.com>> wrote:
All,
Please find below a proposed list of updates to the WG goals and milestones that was presented in Paris, with one modification pushing the P2MP Requirements LC back to Dec 2012.
Please post any comments to the list before Friday 11th May.
Matthew
Done - PWE3 WG started, organize editing teams.
Done - Hold interim meeting, including discussion of priority of service-specific documents and consider pruning some deliverables
Done - Accept drafts of service-specific documents as WG items
Done - PW Requirements Document Last Call
Done - TDM Circuit Documents Last Call
Done - ATM Documents Last Call
Done - Ethernet Documents Last Call
Done - Fragmentation LC
Done - TDM Requirements LC
Done - SONET Documents Last Call
Done - TDM Documents Last Call
Done - Frame Relay Documents Last Call
Done - FCS retention Last Call
Done - Multi-Segment PW Requirements LC
Done - VCCV LC
Done - PWE3 Services MIBs LC
Done - PPP/HDLC PW LC
Done - Wildcard FEC LC
Done - TDM Signaling LC
Done- Multi-Segment Architecture LC
Done - Basic Pseudowire MIBs LC
Done - PW OAM Mapping LC
Done - Multi-Segment PW LC
Done - PW Protection and Restoration Requirements LC
Done - PW Protection and Restoration Architecture
Done - Generic Associated Channel Header LC
Done - PW Protection and Restoration LC
Done - Fiber Channel Encap LC
Done- Multipath PW LC
Done - Packet PW Requirements / solution
Dec 2012- P2MP Requirements LC
Done – PW Status signalling in static/MPLS-TP
July 2012 - Dynamic MS PW LC
Sept 2012- Enhanced PW OAM
Sept 2011 – Signaling extensions for MPLS-TP OAM
Dec 2012- Multisegment PW MIB
Dec 2012- Security Considerations LC
Dec 2012– Congestion Considerations
Dec 2012- P2MP PW Signaling (root initiated)
Dec 2012– P2MP PW Signaling (leaf initiated)
_______________________________________________
pwe3 mailing list
pwe3@ietf.org<mailto:pwe3@ietf.org>
https://www.ietf.org/mailman/listinfo/pwe3
- [PWE3] Updates to goals and milestones Bocci, Matthew (Matthew)
- Re: [PWE3] Updates to goals and milestones Carlos Pignataro (cpignata)
- Re: [PWE3] Updates to goals and milestones Gregory Mirsky
- Re: [PWE3] Updates to goals and milestones Bocci, Matthew (Matthew)
- Re: [PWE3] Updates to goals and milestones Thomas D Nadeau
- Re: [PWE3] Updates to goals and milestones Carlos Pignataro
- Re: [PWE3] Updates to goals and milestones Yaakov Stein
- Re: [PWE3] Updates to goals and milestones Bocci, Matthew (Matthew)
- Re: [PWE3] Updates to goals and milestones Gregory Mirsky
- Re: [PWE3] Updates to goals and milestones Thomas Nadeau
- Re: [PWE3] Updates to goals and milestones Gregory Mirsky