Re: [PWE3] Updates to goals and milestones
Gregory Mirsky <gregory.mirsky@ericsson.com> Tue, 08 May 2012 16:57 UTC
Return-Path: <gregory.mirsky@ericsson.com>
X-Original-To: pwe3@ietfa.amsl.com
Delivered-To: pwe3@ietfa.amsl.com
Received: from localhost (localhost [127.0.0.1]) by ietfa.amsl.com (Postfix) with ESMTP id 3673D21F84C4 for <pwe3@ietfa.amsl.com>; Tue, 8 May 2012 09:57:08 -0700 (PDT)
X-Virus-Scanned: amavisd-new at amsl.com
X-Spam-Flag: NO
X-Spam-Score: -6.47
X-Spam-Level:
X-Spam-Status: No, score=-6.47 tagged_above=-999 required=5 tests=[AWL=0.128, BAYES_00=-2.599, HTML_MESSAGE=0.001, RCVD_IN_DNSWL_MED=-4]
Received: from mail.ietf.org ([12.22.58.30]) by localhost (ietfa.amsl.com [127.0.0.1]) (amavisd-new, port 10024) with ESMTP id 4AKyJrkXb0-L for <pwe3@ietfa.amsl.com>; Tue, 8 May 2012 09:57:05 -0700 (PDT)
Received: from imr4.ericy.com (imr4.ericy.com [198.24.6.9]) by ietfa.amsl.com (Postfix) with ESMTP id 3C00D21F8592 for <pwe3@ietf.org>; Tue, 8 May 2012 09:57:05 -0700 (PDT)
Received: from eusaamw0707.eamcs.ericsson.se ([147.117.20.32]) by imr4.ericy.com (8.14.3/8.14.3/Debian-9.1ubuntu1) with ESMTP id q48GuspT031425; Tue, 8 May 2012 11:56:57 -0500
Received: from EUSAACMS0715.eamcs.ericsson.se ([169.254.1.10]) by eusaamw0707.eamcs.ericsson.se ([147.117.20.32]) with mapi; Tue, 8 May 2012 12:56:52 -0400
From: Gregory Mirsky <gregory.mirsky@ericsson.com>
To: Yaakov Stein <yaakov_s@rad.com>, "Bocci, Matthew (Matthew)" <matthew.bocci@alcatel-lucent.com>
Date: Tue, 08 May 2012 12:56:51 -0400
Thread-Topic: [PWE3] Updates to goals and milestones
Thread-Index: Ac0p4hWVTO5WPsXMRTefgV9GBEa5/f//3iaAgACKqoCABajMAP//j/tg//7vTyA=
Message-ID: <FE60A4E52763E84B935532D7D9294FF13552DBBB25@EUSAACMS0715.eamcs.ericsson.se>
References: <FE60A4E52763E84B935532D7D9294FF13552DBB1A8@EUSAACMS0715.eamcs.ericsson.se> <CBCE99C0.2A66D%matthew.bocci@alcatel-lucent.com> <07F7D7DED63154409F13298786A2ADC9043C67CD@EXRAD5.ad.rad.co.il>
In-Reply-To: <07F7D7DED63154409F13298786A2ADC9043C67CD@EXRAD5.ad.rad.co.il>
Accept-Language: en-US
Content-Language: en-US
X-MS-Has-Attach:
X-MS-TNEF-Correlator:
acceptlanguage: en-US
Content-Type: multipart/alternative; boundary="_000_FE60A4E52763E84B935532D7D9294FF13552DBBB25EUSAACMS0715e_"
MIME-Version: 1.0
Cc: "pwe3@ietf.org" <pwe3@ietf.org>
Subject: Re: [PWE3] Updates to goals and milestones
X-BeenThere: pwe3@ietf.org
X-Mailman-Version: 2.1.12
Precedence: list
List-Id: Pseudo Wires Edge to Edge <pwe3.ietf.org>
List-Unsubscribe: <https://www.ietf.org/mailman/options/pwe3>, <mailto:pwe3-request@ietf.org?subject=unsubscribe>
List-Archive: <http://www.ietf.org/mail-archive/web/pwe3>
List-Post: <mailto:pwe3@ietf.org>
List-Help: <mailto:pwe3-request@ietf.org?subject=help>
List-Subscribe: <https://www.ietf.org/mailman/listinfo/pwe3>, <mailto:pwe3-request@ietf.org?subject=subscribe>
X-List-Received-Date: Tue, 08 May 2012 16:57:08 -0000
Dear Yaakov, at fix terminology along the way - from Connectivity Verification to Continuity Check. Regards, Greg ________________________________ From: pwe3-bounces@ietf.org [mailto:pwe3-bounces@ietf.org] On Behalf Of Yaakov Stein Sent: Tuesday, May 08, 2012 7:04 AM To: Bocci, Matthew (Matthew) Cc: pwe3@ietf.org Subject: Re: [PWE3] Updates to goals and milestones Matthew What if a single document (5085-bis) solves all these problems ? Would you still want 3 milestones ? Does "rationalization of VCCV" include unifying the BFD portion in RFC 5885 with the rest of the modes (thus obsoleting 5085 and 5885) ? Y(J)S From: pwe3-bounces@ietf.org [mailto:pwe3-bounces@ietf.org] On Behalf Of Bocci, Matthew (Matthew) Sent: Tuesday, May 08, 2012 13:19 To: Gregory Mirsky; Carlos Pignataro (cpignata) Cc: pwe3@ietf.org Subject: Re: [PWE3] Updates to goals and milestones Greg, Carlos, I think this milestone started life as referring to any PW OAM extensions required for MPLS-TP. However, it has become very ambiguous. There are really a number of objectives that we should capture, including at least the following: * Additional VCCV Channel Type using the GAL * VCCV capability negotiation for MPLS-TP OAM tools. * Rationalisation of VCCV (RFC5085bis) I think we could replace this milestone with milestones for the above. Regards Matthew On 04/05/2012 20:53, "Gregory Mirsky" <gregory.mirsky@ericsson.com<mailto:gregory.mirsky@ericsson.com>> wrote: Dear Matthew, Carlos, et al., I agree with Carlos that updates to VCCV Control Channels resulting from discussion of GAL as Type 4 VCCV CC, perhaps as RFC5085bis, can be captured in Milestones. But I think that this work not necessarily tied with CV capability extension that, I think, referenced as "Enhanced PW OAM". Regards, Greg ________________________________ From: pwe3-bounces@ietf.org<mailto:pwe3-bounces@ietf.org> [mailto:pwe3-bounces@ietf.org] On Behalf Of Carlos Pignataro (cpignata) Sent: Friday, May 04, 2012 4:38 AM To: Bocci, Matthew (Matthew) Cc: pwe3@ietf.org<mailto:pwe3@ietf.org> Subject: Re: [PWE3] Updates to goals and milestones Matthew, In Paris there was discussion (and subsequent followup) about a VCCV-bis document. I am not sure if a formal consensus call was issued on that, but I wonder if it needs to be captured as a milestone (or how it relates to "Enhanced PW OAM"). Thumb typed by Carlos Pignataro. Excuze typofraphicak errows On May 4, 2012, at 6:39 AM, "Bocci, Matthew (Matthew)" <matthew.bocci@alcatel-lucent.com<mailto:matthew.bocci@alcatel-lucent.com>> wrote: All, Please find below a proposed list of updates to the WG goals and milestones that was presented in Paris, with one modification pushing the P2MP Requirements LC back to Dec 2012. Please post any comments to the list before Friday 11th May. Matthew Done - PWE3 WG started, organize editing teams. Done - Hold interim meeting, including discussion of priority of service-specific documents and consider pruning some deliverables Done - Accept drafts of service-specific documents as WG items Done - PW Requirements Document Last Call Done - TDM Circuit Documents Last Call Done - ATM Documents Last Call Done - Ethernet Documents Last Call Done - Fragmentation LC Done - TDM Requirements LC Done - SONET Documents Last Call Done - TDM Documents Last Call Done - Frame Relay Documents Last Call Done - FCS retention Last Call Done - Multi-Segment PW Requirements LC Done - VCCV LC Done - PWE3 Services MIBs LC Done - PPP/HDLC PW LC Done - Wildcard FEC LC Done - TDM Signaling LC Done- Multi-Segment Architecture LC Done - Basic Pseudowire MIBs LC Done - PW OAM Mapping LC Done - Multi-Segment PW LC Done - PW Protection and Restoration Requirements LC Done - PW Protection and Restoration Architecture Done - Generic Associated Channel Header LC Done - PW Protection and Restoration LC Done - Fiber Channel Encap LC Done- Multipath PW LC Done - Packet PW Requirements / solution Dec 2012- P2MP Requirements LC Done - PW Status signalling in static/MPLS-TP July 2012 - Dynamic MS PW LC Sept 2012- Enhanced PW OAM Sept 2011 - Signaling extensions for MPLS-TP OAM Dec 2012- Multisegment PW MIB Dec 2012- Security Considerations LC Dec 2012- Congestion Considerations Dec 2012- P2MP PW Signaling (root initiated) Dec 2012- P2MP PW Signaling (leaf initiated) _______________________________________________ pwe3 mailing list pwe3@ietf.org<mailto:pwe3@ietf.org> https://www.ietf.org/mailman/listinfo/pwe3
- [PWE3] Updates to goals and milestones Bocci, Matthew (Matthew)
- Re: [PWE3] Updates to goals and milestones Carlos Pignataro (cpignata)
- Re: [PWE3] Updates to goals and milestones Gregory Mirsky
- Re: [PWE3] Updates to goals and milestones Bocci, Matthew (Matthew)
- Re: [PWE3] Updates to goals and milestones Thomas D Nadeau
- Re: [PWE3] Updates to goals and milestones Carlos Pignataro
- Re: [PWE3] Updates to goals and milestones Yaakov Stein
- Re: [PWE3] Updates to goals and milestones Bocci, Matthew (Matthew)
- Re: [PWE3] Updates to goals and milestones Gregory Mirsky
- Re: [PWE3] Updates to goals and milestones Thomas Nadeau
- Re: [PWE3] Updates to goals and milestones Gregory Mirsky