RE: iSCSI-08 Draft Availability?

"Trang Nguyen" <tnguyen@perfisans.com> Fri, 31 August 2001 00:10 UTC

Received: from ece.cmu.edu (ECE.CMU.EDU [128.2.136.200]) by ietf.org (8.9.1a/8.9.1a) with ESMTP id UAA00852 for <ips-archive@odin.ietf.org>; Thu, 30 Aug 2001 20:10:30 -0400 (EDT)
Received: (from majordom@localhost) by ece.cmu.edu (8.11.0/8.10.2) id f7UMZx314166 for ips-outgoing; Thu, 30 Aug 2001 18:35:59 -0400 (EDT)
X-Authentication-Warning: ece.cmu.edu: majordom set sender to owner-ips@ece.cmu.edu using -f
Received: from mail4.tor.primus.ca (mx-backup.primus.ca [216.254.136.135]) by ece.cmu.edu (8.11.0/8.10.2) with ESMTP id f7UMZuP14160 for <ips@ece.cmu.edu>; Thu, 30 Aug 2001 18:35:56 -0400 (EDT)
Received: from dsl-216-254-190-93.tor.primus.ca ([216.254.190.93] helo=perfisan4) by mail4.tor.primus.ca with smtp (Exim 2.11 #1) id 15caPJ-0005yP-07; Thu, 30 Aug 2001 18:35:29 -0400
Reply-To: tnguyen@perfisans.com
From: Trang Nguyen <tnguyen@perfisans.com>
To: Julian Satran <Julian_Satran@il.ibm.com>, ips@ece.cmu.edu
Subject: RE: iSCSI-08 Draft Availability?
Date: Thu, 30 Aug 2001 18:39:53 -0400
Message-ID: <BNEALKHNNHCOIGPENKKMEEFJCBAA.tnguyen@perfisans.com>
MIME-Version: 1.0
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: 7bit
X-Priority: 3 (Normal)
X-MSMail-Priority: Normal
X-Mailer: Microsoft Outlook IMO, Build 9.0.2416 (9.0.2910.0)
Importance: Normal
X-MimeOLE: Produced By Microsoft MimeOLE V5.00.2919.6700
In-Reply-To: <OFD262D3D5.219680EC-ONC2256AB8.006C351B@telaviv.ibm.com>
Sender: owner-ips@ece.cmu.edu
Precedence: bulk
Content-Transfer-Encoding: 7bit

Hi Julian,

Do you have a schedule of when iSCSI protocol will be finalized?

Thanks,

*********************************
 Trang Nguyen
 tnguyen@perfisans.com
*********************************


-----Original Message-----
From: owner-ips@ece.cmu.edu [mailto:owner-ips@ece.cmu.edu]On Behalf Of
Julian Satran
Sent: August 30, 2001 3:43 PM
To: ips@ece.cmu.edu
Subject: Re: iSCSI-08 Draft Availability?



Next week - provided we get some things cooling down. Julo

"CLEMENT,ERIC L (A-Roseville,ex1)" <eric_l_clement@agilent.com>@ece.cmu.edu
on 30-08-2001 21:46:12

Please respond to "CLEMENT,ERIC L (A-Roseville,ex1)"
      <eric_l_clement@agilent.com>

Sent by:  owner-ips@ece.cmu.edu


To:   "'Black_David@emc.com'" <Black_David@emc.com>
cc:   "'ips@ece.cmu.edu'" <ips@ece.cmu.edu>
Subject:  iSCSI-08 Draft Availability?



Hi David,

Do you know what timeframe the iSCSI-08 draft will be available?

Regards,
Eric
__________________________________

Eric Clement
Agilent Technologies, Inc.
1101 Creekside Ridge Drive
Suite 100, MS RH-21
Roseville, California 95661

Phone: 916.788.6211
Fax: 916.788.6134
Email: Eric_L_Clement@Agilent.com
___________________________________



To: ips@ece.cmu.edu
Subject: IPS Draft Status and Schedule
From: Black_David@emc.com
Date: Wed, 22 Aug 2001 17:24:11 -0400
Content-Type: text/plain;charset="iso-8859-1"
Sender: owner-ips@ece.cmu.edu

----------------------------------------------------------------------------

----

Here's what the WG chairs think the current status and schedule
is for the drafts that the IP Storage WG is working on (including
three individual submissions that have agenda time in Orange
County).  This is probably not 100% accurate, but should be
close.  Draft authors - please send any corrections to me.

Apologies for being tardy on this - this should have been done
about a month ago, but I have negative "copious spare time".
Going forward, the intent is to produce an updated version of
this prior to each WG meeting.  Proposed revised charter will
be coming in the near future, with milestones based on the
completion guesstimates below.

Thanks,
--David

-- iSCSI

draft-ietf-ips-iscsi-07.txt
     To be a proposed standard RFC.
     Large portions are stable, major open security and login issues.
     -08 will be a functional/technical revision, document restructure/
          reorganization expected in -09 version.
     Hope to close all major issues by December 2001 IETF meeting

draft-ietf-ips-iscsi-boot-02.txt
     No major open issues, possible minor issues in DHCP usage.
          DHCP material to be extracted into a separate
standards-track draft.
     Remainder to become an informational RFC, after the main iSCSI
document.

draft-ietf-ips-iscsi-reqmts-05.txt
     To be an informational RFC.
     Has completed WG Last Call, currently being considered by the IESG,
          IETF Last Call has not been issued.

draft-ietf-ips-iscsi-name-disc-02.txt
     To be an informational RFC.
     Specification portions that must be standards track are being added
          to the main iSCSI specification.
     No major open issues, hope to close any other issues by December
2001 IETF
          meeting.  Plan to issue WG Last Call for this with main
iSCSI draft.

draft-ietf-ips-iscsi-slp-01.txt
     To be a proposed standard RFC.
     Close to done.  Issues in this general area seem to come up in the
          context of the naming and discovery draft (name-disc-02)
rather
          than this draft.
     WG Last Call will be after the naming and discovery draft.

draft-ietf-ips-iscsi-mib-02.txt
     To be a proposed standard RFC.
     Next (-03) version expected in September, should be close to done.
     WG Last Call will follow main iSCSI draft.

draft-black-ips-iscsi-security-01.txt
draft-aboba-ips-iscsi-security-00.txt
     Unlikely to become RFCs in their current forms.
     New drafts on iSCSI Security for discussion at Orange County
meeting.
          Security requirements will be specified in the main iSCSI
document.
     Some remaining portions of one or both drafts may become an
          informational RFC.  Whether to do this and what portions to
use
          are subject to discussion.

-- FC Common Encapsulation

draft-ietf-ips-fcencapsulation-02.txt
     To be a proposed standard RFC.
     No major open issues.
     Will accompany FCIP and/or iFCP drafts in Last Call, probably after
          December 2001 IETF.

-- FCIP

draft-ietf-ips-fcovertcpip-05.txt
     To be a proposed standard RFC.
     Large portions are stable, major open security issues.
     Hope to close all major issues by December 2001 IETF meeting.

draft-ietf-ips-fcip-slp-00.txt
     To be a proposed standard RFC.
     New draft for discussion in Orange County.
     Hope to close all major issues by December 2001 IETF meeting.

draft-ietf-ips-fcip-mib-00.txt
     To be a proposed standard RFC.
     New draft for discussion in Orange County.
     Likely timeframe for closing final issues is March 2002 IETF
meeting.

-- iFCP

draft-ietf-ips-ifcp-04.txt
     To be a proposed standard RFC.
     Large portions are stable, major open security issues.
     Hope to close all major issues by December 2001 IETF meeting.

draft-tseng-ifcp-mib-00.txt
     To be a proposed standard RFC.
     New draft for consideration in Orange County, will be proposed for
          approval as an official WG draft.
     Likely timeframe for closing final issues is March 2002 IETF
meeting.

-- iSNS

draft-ietf-ips-isns-04.txt
     To be a proposed standard RFC.
     Relationship to SLP for use with iSCSI seems to be settled, no
          other major open issues.
     WG Last Call to follow iSCSI and iFCP drafts.
     Hope to close any remaining issues by December 2001 IETF meeting.

draft-gibbons-isnsmib-00.txt
     To be a proposed standard RFC.
     Relatively new draft, London meeting approved it as an official
          IPS WG work item, next version will be draft-ietf-ips-...
     Likely timeframe for closing final issues is March 2002 IETF
meeting.

-- Framework

draft-ietf-ips-framework-00.txt
     Has not been updated by author team since original revision.
     Likely to be abandoned in the absence of renewed interest.

-- SCSI MIB

There's been talk about working on this, but no draft has appeared, yet.


----- Document Completion Guesstimates ------

A rough guess is 3 waves of documents:

(1) Main protocol standards.  Close technical issues at December 2001 IETF
     (or before), WG Last Call in early 2002, submit to IESG before
     March 2002 IETF Meeting.
     - iSCSI
     - iSCSI Naming/Discovery
     - FC Encapsulation
     - FCIP
     - iFCP
     Last Call scheduling will be an issue, as there are at least two,
     and possibly more 4 week (or longer) WG Last Calls required for
     the above that probably should not overlap with each other.

(2) Supporting Protocol Documents.  Close technical issues at December
     IETF if possible (but above documents have priority).  WG Last
     Call to follow above, probably in March-April 2002.
     - iSCSI Boot
     - iSCSI SLP
     - FCIP SLP
     - iSNS
     iSNS Last Call should not overlap iSCSI Last Calls, hence at least
     two will be needed, but 2 week WG Last Call periods should suffice
     for these documents.

(3) MIBs.  To follow supporting documents.  Final opportunity to discuss
     at March 2002 IETF Meeting, with WG Last Call to follow shortly
     thereafter.
     - iSCSI MIB
     - FCIP MIB
     - iFCP MIB
     - iSNS MIB
     Probably need two Last Call periods, but again, 2 weeks each
     should be sufficient.  May move Last Call schedule up if
     MIBs are ready to go earlier (e.g., after December 2001 IETF
     meeting).

The waves will overlap in practice, but each main protocol document
needs to make it through WG Last Call before any WG Last Calls are
issued for documents that depend on it.  So for any protocol, wave
(1) has to come before (2) and (3), but (2) and (3) can run in
parallel, and the different protocols may run on different schedules.

---------------------------------------------------
David L. Black, Senior Technologist
EMC Corporation, 42 South St., Hopkinton, MA  01748
+1 (508) 435-1000 x75140     FAX: +1 (508) 497-8500
black_david@emc.com       Mobile: +1 (978) 394-7754
---------------------------------------------------